Get a custom quote

Direct from the manufacturer · no middlemen

Get a custom quote.
In 24 working hours.

Tell us the floors, the load and the building. We’ll come back with a fixed quote, lead time and our engineer’s note — no call-centre script, no upsell.

  • 17+ yrs engineering
  • 240+ installs
  • 33 cities served
  • ISO 9001:2015 certified
  • MSME registered
Send a query

Tell us about your project

Two minutes. We reply with a tailored quote within one working day.

  • Direct from the manufacturer · no middlemen
  • Reply within 1 working day
  • Free site survey across 33 Indian cities
  • Engineers Estd. 2007 · SEE brand 2024
or skip the form
What happens next

From your form to your shaft — in four steps.

No black-box. You always know what we’re doing next, who’s handling it, and by when.

  1. 01

    Within 1 working hour

    An engineer (not a sales rep) reads your form, calls or WhatsApps you back, and clarifies the spec — floors, load, civil readiness, timeline.

    Acknowledged
  2. 02

    Day 1–2

    We schedule a free site survey at your building — or a video walk if you’re too far. Shaft dimensions, power tap location, finish preferences, freight access.

    Surveyed
  3. 03

    Day 3–5

    Written quote drops in your inbox: fixed price, full BOQ, lead time, payment terms, engineer’s note on anything we’d do differently. Valid 30 days.

    Quoted
  4. 04

    Once you confirm

    Fabrication starts at our Sukhdarshanpur workshop. Typical lead time 6–8 weeks, then 3–5 days on-site for install and commissioning by our own team.

    Built & installed
No surprises

What’s in the quote — and what’s not.

Included in every quote
  • Unit fabrication at our workshop
  • Freight to site & insurance in transit
  • Installation by our own engineers
  • Commissioning & load-test
  • 12-month comprehensive warranty
  • Test certificate, dimensional report, material test certs
  • Engineer’s note on anything we’d change
Quoted separately
  • Civil work — shaft, pit waterproofing, machine-room flooring
  • Three-phase power tap to the machine room
  • State lift-inspector fees (if your state requires one)
  • Decorative cabin upgrades beyond standard finishes
  • AMC contracts (start from month 13)

We flag every one of these on the quote itself — in a separate “to be arranged by client” section — so there are zero surprises on day-one.

Buyer FAQs

Common questions before you commit.

How long is the quote valid for?

30 days from issue date, locking in pricing on steel, motor, controller, doors and labour. If steel index moves significantly inside that window we honour the quote anyway — only re-issue after 30 days if commodity prices have shifted.

What payment terms do you offer?

Standard: 40% on order confirmation, 50% before dispatch, 10% on commissioning. For repeat clients or government tenders we’ll work to your standard PO terms. GST extra (we’re GSTIN registered — 06ABZFS5230Q1Z8).

Can I customise capacity, cabin finish, dimensions?

Yes — we engineer to spec rather than pick from a catalogue. Capacity bands, shaft dimensions, gate styles, cabin finishes (stainless, MS-powder-coat, mirror, laminate), controller logic, even custom car operating panels. Just send your floor plan or building drawing on WhatsApp; we’ll come back with a feasibility note within 24 working hours.

What’s covered under warranty?

12 months comprehensive from commissioning date — all mechanical and electrical components, including motor, controller, doors and safety gear. Wear items (cables, brake pads, rubber bumpers) follow manufacturer life-cycle. We respond to warranty calls within 24 hours pan-India.

Do I need civil work done before you arrive?

The shaft, machine room (or MRL pocket), pit, headroom and three-phase power tap need to be ready — we issue civil drawings as part of the quote so your contractor can build to spec. We schedule the site survey first, so by the time install day comes, your civil is the right size on day one. We don’t do civil work ourselves; we’ll happily review your contractor’s drawings before they pour.

Will you handle state lift-inspector compliance?

States vary. In Haryana, Punjab and Chandigarh we file inspector paperwork on your behalf as part of commissioning. In Maharashtra / Karnataka / Gujarat / Tamil Nadu we provide all certifications and forms but you (or your liaison) submit them — we’ll guide you through it. Inspector fees themselves are payable to the state directly.